Sole designer across Streamtime’s product and design system, from problem framing to production.

A new brand, live across the whole product in one release.
Design system lead. Tokens, components and docs, through to launch.


Rebuilt scheduling so studios stopped planning in spreadsheets.
Sole designer. Research to launch, 12 months.

Two clashing retainer workflows, one feature that serves both.
Sole designer. Researched with 30+ studios, through to release.

Aged care medication review, with colourblind-safe status coding.
UX consultant. Built to WCAG AA.

I’m Isobel, a product designer based in Sydney, Australia. I work end-to-end: framing the problem, running the research, designing the interface, and staying with it through to production.
“Conducting a good interview is actually about shutting up.”
Erika Hall

Researcher on Never Not Creative's industry study exploring AI's impact in the creative industry.
Panelist for the Design Institute of Australia NSW Portfolio Review Night, offering feedback and guidance to graduating designers.
Juror for the 2025 Design Graduate of the Year Awards, assessing emerging designers across Australia.
National winner of Design Graduate of the Year in the USE category, Higher Education.


.jpg)